Reconstruction work during the corona pandemic
DOI:
https://doi.org/10.31263/voebm.v73i3-4.5339Keywords:
library remodeling, Anarchistische Bibliothek Wien, library relocationAbstract
The Anarchistische Bibliothek | Archiv | Institut für Anarchismusforschung Wien and its entire library collection will be moving to a new building, the premises will have to be completely renovated before that. The focus is on the use of sustainable materials, the aim being an ecologically climate-neutral library. The renovation work was hampered by closed stores and personnel restrictions during the COVID-19-related lockdown, as well as a lack of financial resources. The article traces the activities and progress of the library during the months of April to October 2020 by means of the “Baustellen Info”, which is continuously sent out as a newsletter.
Downloads
References
Anarchistische Bibliothek & Archiv I Institut für Anarchismusforschung Wien, Umbau – Baustelle 02: https://a-bibliothek.org/bilder/umbau-baustelle-02/
Bibliothekskollektiv Anarchistische Bibliothek & Archiv Wien (2014): Anarchistische Bibliothek & Archiv Wien. LIBREAS, Library Ideas 26. https://libreas.eu/ausgabe26/04kollektiv/
Published
How to Cite
Issue
Section
License
Copyright (c) 2020 Anarchistische Bibliothek | Archiv | Institut für Anarchismusforschung Wien
This work is licensed under a Creative Commons Attribution 4.0 International License.
Alle Inhalte dieser Zeitschrift – exkl. einzelner Logos und Abbildungen – sind lizenziert unter CC BY 4.0.