Reconstruction work during the corona pandemic

Authors

  • Anarchistische Bibliothek

DOI:

https://doi.org/10.31263/voebm.v73i3-4.5339

Keywords:

library remodeling, Anarchistische Bibliothek Wien, library relocation

Abstract

The Anarchistische Bibliothek | Archiv | Institut für Anarchismusforschung Wien and its entire library collection will be moving to a new building, the premises will have to be completely renovated before that. The focus is on the use of sustainable materials, the aim being an ecologically climate-neutral library. The renovation work was hampered by closed stores and personnel restrictions during the COVID-19-related lockdown, as well as a lack of financial resources. The article traces the activities and progress of the library during the months of April to October 2020 by means of the “Baustellen Info”, which is continuously sent out as a newsletter.

Downloads

Download data is not yet available.

References

Anarchistische Bibliothek & Archiv I Institut für Anarchismusforschung Wien, Umbau – Baustelle 02: https://a-bibliothek.org/bilder/umbau-baustelle-02/

Bibliothekskollektiv Anarchistische Bibliothek & Archiv Wien (2014): Anarchistische Bibliothek & Archiv Wien. LIBREAS, Library Ideas 26. https://libreas.eu/ausgabe26/04kollektiv/

Published

2020-12-29

How to Cite

Anarchistische Bibliothek (2020) “Reconstruction work during the corona pandemic”, Communications of the Association of Austrian Librarians, 73(3-4), pp. 370–380. doi: 10.31263/voebm.v73i3-4.5339.