The Reconstruction of the University Library of Graz – a Report in Three Sequels. Part 2: On the Fall and Rise of a Building
DOI:
https://doi.org/10.31263/voebm.v71i3-4.2162Keywords:
University Library of Graz, reconstructionAbstract
This part of the report contains the period from the demolition of the old building until the topping-out ceremony in July 2018.
Downloads
Download data is not yet available.
References
Werner Schlacher: Wie alles begann“. Mitteilungen der Vereinigung Österreichischer Bibliothekarinnen und Bibliothekare 69 (2016) 3/4, S. 422–435. https://doi.org/10.31263/voebm.v69i3.1732
Downloads
Published
2018-12-28
How to Cite
Schlacher, W. (2018) “The Reconstruction of the University Library of Graz – a Report in Three Sequels. Part 2: On the Fall and Rise of a Building”, Communications of the Association of Austrian Librarians, 71(3-4), pp. 416–424. doi: 10.31263/voebm.v71i3-4.2162.
Issue
Section
Articles
License
Copyright (c) 2018 Werner Schlacher
This work is licensed under a Creative Commons Attribution 4.0 International License.
Alle Inhalte dieser Zeitschrift – exkl. einzelner Logos und Abbildungen – sind lizenziert unter CC BY 4.0.